Kitchen design and installation · Up to 130 km around Pau
Taupe kitchen with a wooden island
Kitchen guide

Kitchen renovation schedule: the order of works

Who comes in when, from removal to finishing.

The typical order

  1. Design and quotation approved, order placed
  2. Removal of the old kitchen
  3. Any structural work (openings, partitions)
  4. Plumbing and electrics
  5. Floors, walls, plastering, base coat of paint
  6. Unit installation
  7. Templating and worktop fitting (mineral worktops)
  8. Splashback, connections, appliances
  9. Finishing and adjustments

Anticipate lead times

Manufacturing lead times for units and mineral worktops set the installation date. Time the removal to match delivery to limit the period without a kitchen.

Living through the works

Set up a temporary kitchen (microwave, portable hob, fridge) in another room and protect nearby floors and furniture from dust.

Indicative guide. Each project is studied by the professional.

Bright kitchen with a white island
New · personalised visualisation

Visualise Your Dream Kitchen

Upload a photo of your current kitchen, choose a range, a style and a collection: we create an inspiration image of your renovated room and emails it to you. First image free.

Computer-generated inspiration image — not a plan or a quotation.

FAQ

Frequently asked questions

Your project

Let's talk about your future kitchen

Configure your kitchen in a few minutes or describe your project: a kitchen specialist will contact you to discuss it.

Request a call-backRequest a quote